Solstice Power
Encouraging renewable energy partnerships
Building a more sustainable energy future for Europe.
1. Site Review
Review details of grid connection capacity, local planning and environmental impact assessment. Determine the actual capacity of the development.
2. Studies
Technical and environmental studies, obtaining costings for grid connection, preparing preliminary design. Liaise with local authorities.
3. Planning permission and connection
Preparation of plans for planning application. Design and plans for grid connection. Submission to the relevant authorities.
4. Ready to build
All permits have been received. The project is ready to be built and construction can begin.